top of page

RC Gold Project, Yukon, Canada

  • Aug 5
  • 1 min read
RC Gold Project, Yukon, Canada
RC Gold Project, Yukon, Canada

Diamond drilling continues to play a critical role in expanding our understanding of mineral systems and unlocking new resource potential.


Sitka Gold has provided an update on its 60,000-metre diamond drilling program at the RC Gold Project in Yukon, Canada. The ongoing campaign is focused on expanding the Blackjack and Rhosgobel gold deposits while testing additional high-priority exploration targets across the project.


Key Highlights:

  • 60,000 m diamond drilling program underway

  • Six drill rigs active across the project

  • Resource expansion drilling at Blackjack & Rhosgobel

  • Additional high-priority exploration targets under evaluation


Systematic drilling, detailed geological logging, and continuous exploration are helping to improve geological confidence and support long-term resource growth within the Tombstone Gold Belt.


Mineral exploration begins with quality data—and every metre drilled brings us closer to understanding the geology beneath the surface.


Source:


Additional Drill Results:

 
 
bottom of page